In this Instructable I will show you step by step how to make a drying tower to hold rectangle drying racks.

Dehydrator List of tools:

1/16" Drill Bit
Framing square
Small square
Safety Glasses
Mitre' chop saw or back saw and mitre box
Wood saw
3/16" drill bit
Screw tips for drill extention- hex and or Phillips/cross tip
Tape measure
Tin Snips
Chalk Line/chalk
Caulking gun or small tube of caulk

Bill of Materials:

Sheet rock screws- 16 ea
#8x3/4" screws, or hex head self taping screws
1-1/4" sheet rock screws-12
Hinges
Foam gap filler
1 sheet 1/4"x4"x8" plywood or other siding material
8'x2'panelized roofing clear or other clear sheeting
2-2'x18" min pieces of galvanized or other sheet metal (for solar collector and heat shield inside)
12 ea 1"x3"x8" spruce for framing and rails for racks
2 ea hinges for door
Hinges screws
Door latch
Netting to keep bugs out of openings
PVC pipe (optional)
Caulking-small tube
3 porcelain light fixtures pull cord
3 octagon electrical boxes
Electrical wire
Wire connectors
Light bulbs
Plug
Wire nuts
Switch box
Switch
Switch plate

Side Wall

P1000273.JPG
First you will need a 4'x8' sheet of 1/8 inch thick plywood.

SIde Supports

P1000288.JPG
Next its time to cut your side wall support braces.

1. Cut two boards that are 38" long and sqare at the ends.

2. Cut two more boards that are 30 5/8" at there longest point. Next you need to cut the top of the boards off at a 20 degree angle.

3. Cut two boards that are 41 1/4" then cut off a 20 degree piece from one end, then cut of a second 20 degree piece perpendicular to the first cut.

4. Cut the last two boards 42 3/4" inches long and cut off a 20 degree piece from the top.

Mark Walls

P1000287.JPG
P1000276.JPG
P1000278.JPG
P1000285.JPG
P1000291.JPG
Next you are going to need to lay out your boards as shown in the first image so that you can mark around them. The forth picture shows what the measurements should be and what the wall will look like when you cut it. Now that you have your board marked cut out your wall you will need two of them.

Screwing on Support Beams

P1000299.JPG
Next you will need to screw the support beams to the side of the wall. These supports should be on the out side and face away from each other.

Back Supports

P1000303.JPG
P1000300.JPG
You now need to cut two boards that are 24" long and screw them to the top and bottom of the back.

Front Supports

P1000311.JPG
P1000308.JPG
Now cut two more boards that are 22" long and screw them to the front. You will need to screw them from the side.

Roof

P1000325.JPG
P1000314.JPG
You now need to cut a piece for the roof from a piece of PVC roofing cut it 4 feet long. We used tin snips to cut the roofing.

Front

P1000328.JPG
P1000344.JPG
P1000342.JPG
Next you need to cut a second piece of the PVC roofing for the front. Cut it 32" long.

Now you need to screw the roof and the front on.


Door and Floor

P1000345.JPG
P1000346.JPG
Next cut out a piece for the floor it should be 24"x38 3/4"

Then cut out a piece for the door it should be 24"x42 3/4"

Runners for the Racks

P1000358.JPG
P1000366.JPG
P1000369.JPG
You will need to to cut 4 pieces of a 1"x4" board 35" long.

Then cut the boards in half.

And drill a hole in both ends of the board 3 1/2" from each end.

Legs

P1000354.JPG
P1000356.JPG
P1000357.JPG
Next you need to add legs to your drying tower if you place each of the legs in a pail of water then bugs cant crawl into your tower.

Cut 4 legs that are 12" long and cut from a 1"x4"

Then mark out a square and draw a line at a 45 degree angle.

Drill two holes one on each side of the diagnle line.

Door

P1000384.JPG
apple2 007.JPG
P1000381.JPG
You now need to cut four boards to screw around the edges of the door that was cut out earlyer.

The boards need to be cut from a 1"x4"

The first two should be 18 15/16"

The second two should be 42 5/8"

Now screw the boards to the door.

You can add a latch to the middle of the 42 5/8" board.

You will need to to miter out a section of the door so that you can screw the hinge on flush to mount the door to the tower.

Solar Heater/Collector

P1000404.JPG
P1000405.JPG
Start with a 2'x18" piece of galvanized or other sheet metal and paint it flat black on both sides.

Bend the End

P1000406.JPG
P1000408.JPG
You now need to bend one end of the metal at 30-7/8".

Heater

P1000419.JPG
P1000415.JPG
P1000416.JPG
P1000421.JPG
P1000559.JPG
P1000562.JPG
You now need to cut 5 more boards.

2 should be 30 7/8" and be cut from a 1"x4" board
2 should be 30 7/8" and be cut from a 1"x2" board
and the last 1 should be 14 1/2" and be cut from a 1"x2" board

Drill two holes in either end of the 1"x2"s it doesn't matter were you drill the holes but make them around 3"s in.

Now screw thought the black side of the metal and into the 1"x4" boards you should screw them in at about 4". they should be flush with the metal, do this to both sides. Now black your 1"x2" boards to the top of the metal and screw them thought the holes and in to the black side of the metal.

Now screw a 20"x30-7/8" board to the 1"x4" boards.

Solar Heater Cover

apple 004.JPG
apple 002.JPG
apple 001.JPG
Now you need to use whats left of your roofing and screw it to the top of the solar heater. We cut a piece off the front to make up for what we needed to cover the heater. Then we cut it to the correct width.

You should have two pieces of roof left you will use them and some wood to cover the front back up later.

Cover the Front

good.JPG
front.JPG
this one.JPG
You now need to cut two boards to screw to the front. You can see the dimensions in the picture below. Now screw these boards so that they are flush to the bottom and side of the tower.

Now screw the two pieces of plastic to the front.

Foam

P1000573.JPG
P1000571.JPG
P1000572.JPG
P1000577.JPG
P1000583.JPG
P1000574.JPG
P1000576.JPG
appledone.JPG
You now need to fill all the cracks and gaps with clauking and Great Stuff(foam in a can).