Festival Stage - Castle of Love
Main stage Dance festival Castle of love.
The castle wall with drawbridge are made of Styrofoam insulation.
Measurements are: 22 meters wide and 10 meters high.
Materials Needed
-styrofoam/ insulation foam plates
-iron grid
-tyraps
-layher
-paint
Technical Drawing
Drawing of the layher. These are the dimensions to which the iron grids, with the stones, need to be made.
This is all made in advance, in order to make sure that the build-up of the festival site proceeds rapidly.
The prefab.
Prefab
In order to make the stones, the Styrofoam plates need to be cut in pieces of different sizes.
Prefab
Attach the iron grids onto the layher with tyraps.
Then attach the 'stones' to the grid.
Prefab
Carve the blocks in a way that they will get a 'brick'shape.
Prefab
Give accents to the bricks using paint, so they appear to have cracks/holes.
Prefab Done
Take off the grids from the layher, and transport them to the festival side.
Layher Constuction on the Festival Side
Attachement of the Grids Onto the Layher
Installation Technique and Audio
LED screens
Lights
Audio
Flame jets
Fountains
Laser
co2 jets
Party!
p.s.
Drink responsibly :D :P