How to Install Pavers
STEP 2: Geotextile Layer Installation (where applicable)
STEP 3: Base Installation – 4-6 inches
STEP 4: Drainage System Installation (where applicable)
STEP 5: Compaction Base Added
STEP 6: Wash Bedding Sand installation – 1-2 inches
STEP 7: Paver Stone Installation
STEP 8: Paver Compaction and Setting
STEP 9: Polymeric Epoxy Sand Installation
STEP 10: Newly Installed Stones are Cleaned
STEP 11: Sealer Application (recommended)
STEP 12: Final Inspection and Approval