Knex Ball Machine Copper
Hi guys.
Welcome to my newest ball machine copper. Sorry about some of the grainy pictures, I was building it in my basement. (which I will never do again) In my opinion the video turned out better than I had expected. Pictures 34 through 38 shows you how I modified the stepper lift to fit the newer balls. So I guess you could say it's a modified modified stepper lift. Anyway here are the details and some of the elements.
Welcome to my newest ball machine copper. Sorry about some of the grainy pictures, I was building it in my basement. (which I will never do again) In my opinion the video turned out better than I had expected. Pictures 34 through 38 shows you how I modified the stepper lift to fit the newer balls. So I guess you could say it's a modified modified stepper lift. Anyway here are the details and some of the elements.
- networks - 3
- lifts - 5
- tracks - 12
- new elements (including new types) - 18
- height - aprox. 5'
- length - aprox. 6'
- depth - aprox. 3'
- pieces - not a clue
- building time - about 2 months
- Alternating arm lift - Shadowman39 and Tornado96
- Modified stepper lift - Shadowman39
- Stacker lift - bezempje95
- Conveyor belt (new type) Keggore1 (aka therealkeggore)
- The elliptica - I_am_Canadian
- The 2 ball ball arm - sathothy
- The two balls divider - sandroknexmaster
- panel stairs - nschmal1