Massive Concrete-Kitchen

by Patrick LASCHETTE in Living > Kitchen

37958 Views, 352 Favorites, 0 Comments

Massive Concrete-Kitchen

IMG-20141114-WA0008.jpg

A friend of me asked to build him an massive concrete kitchen,... in fact he planed to have a kitchen island in 2 meter by 4 meters....so i had to do this... a new challenge ;)

Building the Framwork / Mold

IMG-20140707-WA0029.jpg
IMG-20140707-WA0028.jpg
IMG-20140707-WA0027.jpg
IMG-20140707-WA0026.jpg
IMG-20140707-WA0019.jpg
IMG-20140707-WA0020.jpg
IMG-20140707-WA0022.jpg
IMG-20140707-WA0021.jpg
IMG-20140707-WA0023.jpg
IMG-20140707-WA0018.jpg
IMG-20140707-WA0024.jpg
IMG-20140707-WA0025.jpg

So framework was pretty fast done we used plywood and some sprew planks, it had to be done cheap and fast... to reinforce the structure we used some pvc pipe in the middle to fill with concrete ass a column. wee needed one day to set it on

Preparing for the Concrete

IMG-20140707-WA0006.jpg
IMG-20140707-WA0008.jpg
IMG-20140707-WA0009.jpg
IMG-20140707-WA0005.jpg
IMG-20140707-WA0007.jpg
IMG-20140707-WA0012.jpg
IMG-20140707-WA0013.jpg
IMG-20140707-WA0010.jpg
IMG-20140707-WA0014.jpg
IMG-20140707-WA0016.jpg

so now it was time to place the ironmats and the steelbars... to get the hole thing fixed we screwed holes in the screed 10 cm deep and putted the steelbars in

Concrete

IMG-20140707-WA0000.jpg
IMG-20140707-WA0001.jpg
IMG-20140707-WA0002.jpg
IMG-20140707-WA0003.jpg

we used in total 1,5 tons of concrete to fill the hole mold and we wher doing the mixing by hand and transported with buckets from the garage to the kitchen... that day was long started 8 in the morning and finished 3 in the morning the other day :)

Finish the Concrete

IMG-20140715-WA0000.jpg
IMG-20140715-WA0001.jpg
IMG-20140715-WA0002.jpg
IMG-20140715-WA0003.jpg

I used some cement and powdered it on the concrete

De-molding

IMG-20140719-WA0004.jpg
IMG-20140719-WA0002.jpg
IMG-20140719-WA0005.jpg
IMG-20140719-WA0003.jpg
IMG-20140719-WA0008.jpg
IMG-20140719-WA0007.jpg
IMG-20140719-WA0006.jpg
IMG-20140719-WA0014.jpg

after 3 weeks we thought that the concrete must have been dried long enough and we started carefully on de-molding... that part was the trickiest thing because we had to work safely because we dont wanted to harm the edges... we noticed there have been some little holes so we seeled them with new concrete

Finish

IMG-20140719-WA0010.jpg
IMG-20140719-WA0001.jpg
IMG-20140719-WA0000.jpg
20140830_191649.jpg
20140830_191657.jpg
20140830_191707.jpg
20140830_191715.jpg
20140830_191727.jpg
20140830_191738.jpg
IMG-20140719-WA0017.jpg
IMG-20140719-WA0016.jpg
20140830_191908.jpg
IMG-20140719-WA0009.jpg
IMG-20140719-WA0011.jpg
IMG-20140719-WA0012.jpg
IMG-20140719-WA0015.jpg
IMG-20140719-WA0013.jpg

We mounted the furniture, (bought at ikea) and placed it under the concrete. after mounting all electrics and sink an etc... tadaa it was ready to use