Sphere/Globe Kitchen ***My Biggest Project Ever***

by Patrick LASCHETTE in Living > Kitchen

4571 Views, 48 Favorites, 0 Comments

Sphere/Globe Kitchen ***My Biggest Project Ever***

FL469ZJH1JUH4R5.LARGE.jpg

In 2004 i bought my house and i wanted to rebuild everything... so kitchen is the mainplace in a house so i decided to put that kitchen to an other level of diying :)

Demolition an Re-building Room for Kitchen

DSCF0033.JPG
DSCF0034.JPG
DSCF0032.JPG
DSCN0004.JPG
DSCN0005.JPG
DSCN0192.JPG
DSCN0193.JPG
DSCN0194.JPG
DSCN0196.JPG
DSCN0246.JPG
DSCN0241.JPG
DSCN0243.JPG
DSCN0244.JPG
DSCN0258.JPG
DSCN0259.JPG
DSCN0251.JPG
DSCN0252.JPG
DSCN0253.JPG
DSCN0254.JPG
DSCN0255.JPG
DSCN0256.JPG
DSCN0257.JPG
DSCN0278.JPG
DSCN0309.JPG
DSCN0301.JPG
DSCN0302.JPG
DSCN0304.JPG
DSCN0307.JPG
DSCN0354.JPG
DSCN0527.JPG
DSCN0551.JPG
DSCN0571.JPG
DSCN0560.JPG
DSCN0570.JPG
DSCN0690.JPG
DSCN0675.JPG
DSCN0682.JPG
DSCN0687.JPG
DSCN0699.JPG
DSCN0698.JPG
DSCN0754.JPG
DSCN0755.JPG
DSCN0725.JPG
DSCN0731.JPG
DSCN0728.JPG
DSCN0730.JPG
DSCN0740.JPG
DSCN0753.JPG
DSCN0809.JPG
DSCN0810.JPG
DSCN0813.JPG
DSCN0899.JPG
DSCN0900.JPG
DSCN0877.JPG
DSCN0884.JPG
DSCN0969.JPG
DSCN0931.JPG
DSCN0932.JPG
DSCN0933.JPG
DSCN0934.JPG
DSCN0936.JPG
DSCN0940.JPG
DSCN0948.JPG
DSCN0973.JPG
DSCN1011.JPG
DSCN1026.JPG
000_0018.jpg
000_0019.jpg
100_0120.JPG

2 years for demolition and rebuilding... see the photos for the step by step

Demolition an Re-building Room for Kitchen Part 2

100_0235.JPG
100_0216.JPG
100_0228.JPG
100_0229.JPG
100_0233.JPG
100_0260.JPG
100_0247.JPG
100_0249.JPG
100_0254.JPG
100_0280.JPG
100_0279.JPG
100_0322.JPG
100_0300.JPG
100_0309.JPG
100_0317.JPG
100_0340.JPG
100_0329.JPG
100_0331.JPG
100_0334.JPG
100_0335.JPG
100_0405.JPG
100_0402.JPG
100_0403.JPG
100_0404.JPG
100_0432.JPG
100_0431.JPG
100_0515.JPG
100_0440.JPG
100_0441.JPG
100_0447.JPG
100_0451.JPG
100_0478.JPG
100_0481.JPG
100_0508.JPG
100_0510.JPG
100_0579.JPG
100_0568.JPG
100_0569 - Copie.JPG
100_0571.JPG
100_0573.JPG
100_0577.JPG
100_0608.JPG
100_0610.JPG
100_0630.JPG
100_0631.JPG
100_0632.JPG
100_0635.JPG
100_0619.JPG
100_0622.JPG
100_0625.JPG
100_0626.JPG
P020609_20.21.JPG
100_8460.JPG
100_8422.JPG
100_8425.JPG
100_8426.JPG
100_8434.JPG
100_8452.JPG
P170709_14.49[01].JPG
P170709_14.52.JPG
P170709_14.48.JPG
P180709_17.17[02] - Copie.JPG
P180709_17.17[03] - Copie.JPG
100_8529.JPG
100_8530.JPG
100_8520.JPG
100_8521.JPG
100_8524.JPG

Planing and Design

Kischen-final 2.JPG
kichen - Draufsicht.bmp

I dont have skills in paintshop or other drawprograms so i choosed Microsoft paint to do my drawings

Building the Mold

FMS94GOH1LWPR46.LARGE.jpg
F58HYN0H1JUIUH7.LARGE.jpg
FY8YORGH1JUIUHE.LARGE.jpg
F7ILKDSH1JUIUHG.LARGE.jpg
F9ZSNIAH1LWPR4V.LARGE.jpg

I needed a mold to produce my 120 diameter bowls, so we started on building with plaster and styrofoam plates. see the photos for step by step.

after the mold was ready i taped some orange foil over it so i can easily remove the finished piece and redo an other one without destroying or damaging the mold

Building the Bowls

FL9AXZ4H1PISVBA.LARGE.jpg
FHIGVTMH1LWPR5B.LARGE.jpg
FWXOCMAH1JUH4TW.LARGE.jpg
F6LUORWH1LWPR5D.LARGE.jpg
FBJMSWZH1JU57UX.LARGE.jpg
F15FS15H1JUIUHL.LARGE.jpg
FVMHFNAH1JUH4TI.LARGE.jpg

i cutted glasfibermats in triangles and nailed them on to the mold, thought this way it would be easier to do and would also be stronger, after all was covered i used resin to harden the glasfibermats... i had to do 2 identical bowls... unfortunately one broke i did the wrong mix with resin and hardener so infact in total i build 3 bowls :)

Reinforce Bottom Bowl

F1MD44TH1JUIUHU.LARGE.jpg
F344RW1H1JUH4U1.LARGE.jpg
FLZUAHWH1JU58N8.LARGE.jpg
F8SWD78H1KHA94F.LARGE.jpg

in the bottom bowl i had to make some reinforcement and to permit to set in the sink, hob etc...so i used betonplexplate and builded a frame to screw the mole on, to save some weight i cutted out unneeded space of the betonplex

Smooth Over and Filler, Sanding and Primer

FEDSWHDH1JUIUI7.LARGE.jpg
FUE6H5CH1KHA94P.LARGE.jpg
F8WTTJBH1JUH4U4.LARGE.jpg
F3VB7H2H1JUH4U6.LARGE.jpg
FMZI7JGH1JUH4UD.LARGE.jpg
FA7EA9FH1PISVCC.LARGE.jpg
FWWHJ1HH1JUH4VX.LARGE.jpg
FRC57RPH1LWPR62.LARGE.jpg
FCCOUNGH1LWPR5X.LARGE.jpg
FFO262IH1JUIUIK.LARGE.jpg
FLLV8U8H1JU58Q1.LARGE.jpg

So i started to fill all with carputty, layer by layer until i got a smooth surface, wetsanding and putty again and again... and sanding, and putty and sanding, and putting...the bottom bowl was pretty fast done, because i just had one side, but the topbowl was more to do because i wanted to add the extractor hood in to that bowl, i had to smooth and fill the inner side and the ouside of the bowl... so all again.. putty and sanding, putting and sanding... finally after 3 months (only worked on weekends) the results were good enought to get the bowls painted

Cupboard

F49QQAVH1KHA937.LARGE.jpg
FAJ0657H1LWPR34.LARGE.jpg
FW0WMZDH1JU57T2.LARGE.jpg
F0Y6ZM0H1JUH4SN.LARGE.jpg
F2X0V1NH1JUH4SR.LARGE.jpg
FMIB9MYH1PISV6Y.LARGE.jpg
F35FYRCH1PISV6S.LARGE.jpg
FO2M2CWH1PISV6W.LARGE.jpg
FYIRAHJH1JUIUGB.LARGE.jpg
FTWJEDRH1LWPR3U.LARGE.jpg
FDVIOG5H1KHA93J.LARGE.jpg
F0SG4STH1PISV71.LARGE.jpg

In the kitchen room i buildet a wall where i wanted to place the Cupboard an where i could set in the oven.

In fact that was the easiest part of the hole kitchen. i took beechwood and added (glued on) some black plexiglas fronts

Bottomj-Bowl Plate

FBVFH61H1JU58R1.LARGE.jpg
F50RPBIH1JUIUIR.LARGE.jpg
FM72BIIH1JUH4X7.LARGE.jpg
FN2J6A3H1JU58RT.LARGE.jpg
FGP6UCZH1LWPR66.LARGE.jpg
FTHR1WFH1PISVD0.LARGE.jpg
FGL25AXH1JUIUIU.LARGE.jpg
FHZ2OQMH1LWPR79.LARGE.jpg
FKS5W8OH1KHA95Q.LARGE.jpg

So i had to cut out the sink, the hob, a bucket and a hole for the powercable. I used two planks glued them togetter and reinforced by srewing aluminium bars under the plate

Paintjob

FVP99J7H1JU58S6.LARGE.jpg
F1G5HCBH1PISVDA.LARGE.jpg
FW3L3E0H1PISV73.LARGE.jpg
FIAL8XPH1JUH4XK.LARGE.jpg

that was pretty easy, primer and 3 layers of black carcolor and finally 3 layers of protective lacquer

Finish

FWFDAQLH1JUIU7W.LARGE.jpg
FGL7K50H1KHA92C.LARGE.jpg
FWMMWY7H1JUH4SK.LARGE.jpg
FXB6JP7H1JUH4RE.LARGE.jpg
FXWSLCNH1JUIU7S.LARGE.jpg
F4P6KVKH1JUIU9G.LARGE.jpg
F9VQX33H1JUH4RX.LARGE.jpg
F07655RH1JU57QP.LARGE.jpg
FGKQU3NH1KHA92X.LARGE.jpg
FAQ0I8CH1JUIUEN.LARGE.jpg
FD5X0CAH1JUH4SE.LARGE.jpg
FISD0WYH1JUIU82.LARGE.jpg
FLV4QM8H1KHA92F.LARGE.jpg
FQQ5ZTTH1JUIU9M.LARGE.jpg

Meanwile the room was ready and we could mount everything... it took us 2 weekends to get all in place.

I mounted a electric cable in the seeling so i could lift the top bowl from the bottom to the top of 4 meters or higher, see photos :)... when i am not cooking, i let the bowl closed, and when i want to cook i just lift by pressing a button

It took us more then 3 years in total, but i was so excited that my ideas and drawings become reality ;)

One note for everyone, like i already mentioned my english is very very worse,...all appologies ;)