Pool Cleaning Project

by tonioni in Outside > Backyard

1253 Views, 0 Favorites, 0 Comments

Pool Cleaning Project

0902151323e.jpg
0915151625a.jpg

when I purchased this (HUD) home back in 2015

this pool water was sitting for approximately 4 years stagnant under the Florida sun.

the cover was recently added.

Cover Off !

0914151612b.jpg
0915151625b.jpg
0917151514b.jpg
0917151514a.jpg

i started by renting a 1/2 HP (horsepower) submersible sump pump Maximum flow rate pumps up to 5100 GPH, (gallon per hour)

i simply tied a rope around the pump and dropped into the pool, discharge hose was placed in a 4'' inch sewer pipe drain about 50 ft from the pool ...

plug pump, draining process begins .

it will take approx.. 6-8 hours to complete drainage.

although the pool is 16000 gallons.

the longer you run your drainage hose the less pumping power you will have.

i ran the discharge hose about 50 ft ,losing half of the pumping power.

Draining Has Begun

0917151643.jpg
0917151515a.jpg
0917151644.jpg
0917151514.jpg
0917151643a.jpg
0917151914.jpg
0917151913c.jpg
0917151913b.jpg
0917151514d.jpg
31343f4d3f17df5f2c2c78025c805e89.jpg
0918151410b.jpg

Thick black algae residue, decomposed leaves and branch matter uncovering

Dozens of Garbage Bags

0917151915c.jpg
22bebd6f0f31cc7f3dd3eb83c43dece1.jpg
54fe9e3318e140553ab8db56f55f5dfa.jpg
0918151410c.jpg
0918151430b.jpg
0918151430.jpg

Use a hard rake with a commercial broome with hard bristles , sweep all decompose leaves and branches in a pile, use a square tip shovel to scoop up leaves.

place leaves into a heavy duty contractors garbage bags, poke a number of holes at the bottom of bags.

allow drainage...although it's only leaves ...they are soaked, so extremely heavy ,do not fill bag to top

place the bags on lawn for a day or two to allow drainage before putting them out for collection.

After All Pick Up

d3f9da1b2ffe35fc737b1286cd689bca.jpg
0918151737d.jpg
0921151425_HDR.jpg
0919151555b.jpg
e1ee514d7f66654d0acb473842bb3659.jpg

Start with a 3200 psi.pressure washer to soak side walls,

I used about 18 , one gallon jugs of chlorine to soak walls of pool to loosen up the black algae.

although no photo of me wearing protective gear is seen.

I was wearing protective gear such as goggles, respirator mask, boots and, heavy duty gloves.

(YOU WILL NEED TO PROTECT YOURSELF WHEN DEALING WITH HARMFUL CHEMICAL).

Pressure Wash & Rinse

0921151552d_HDR.jpg
04d285b328b7f271075c215dcaddc549.jpg
fc78fcf3e766bea8ef4d64d16814f95c.jpg
8811c8e22695aa7ba11e2a33015725ef (1).jpg
edf9ae3646021f43f052af4e160c8e36.jpg
9a7d97b6168c0ddb4c80a7e894524ebc.jpg

after the chlorine wash rinse using only water, (so not to mix chlorine with muriatic acid)

followed by an acid wash

Muriatic Acid Wash

0919151917d.jpg
86fd473ee2a8ae90878b0782575963d7.jpg
15a93d5c80a47690fc67b0a7eeecead9.jpg
0919151918.jpg
14ac9b6675ed8520713a9646adfc4499.jpg

After the chlorine wash & rinse

you are now ready for the acid wash...

( IF YOU ARE GOING TO TACKLE THIS PROJECT MAKE SURE YOU'RE WEARING PROTECTIVE GEAR.)

RINSE & Drain

0921151552a_HDR.jpg
72ff6ba882d5c504010c9cb4e2c041d4.jpg
1019151307a_HDR.jpg

after acid wash, Drain and rinse one more time with only water.

and drain one final time.

You Are Now Ready to Fill Your Pool

1019151307_HDR.jpg
1020151545a_HDR.jpg
1020151545_HDR.jpg

Running continuously with a garden hose it will take approx 20 -24 hr to fill pool.

Final Step Add Chlorine

1020151838_HDR.jpg
1020151837a_HDR.jpg
1020151837_HDR.jpg

call a licensed pool professional to add all necessary chlorine .

wait 24 hr before swimming.

Water Turns Blue As a Result of the Added Chlorine

0619161219_HDR.jpg
1031151453_HDR.jpg
1031151454_HDR.jpg

Enjoy..!