SBM-20 End Caps, Turn Your SBM-20-1 to a SBM-20

by rhettapplestone in Circuits > Electronics

73 Views, 0 Favorites, 0 Comments

SBM-20 End Caps, Turn Your SBM-20-1 to a SBM-20

IMG_6724.JPG

This document shall serve as a quick and dirty guide on how to put ends on the SBM-20-1 with use of a 3d printer and brass tube. You may have ordered the SBM-20-1 and need a way to attach it to your geiger counter

Supplies

  • 3d printer (cheap ones are fine, this one I use was $112 from micro center)
  • PLA+ True Red filament 1.75mm (other colors work fine too, but red matches the original)
  • H62 1/4"(6.5mm) OD Brass Tube 0.5mm Wall × 300mm Length Brass Tubing Seamless Round Tubing
  • Pliers
  • Files and/or sand paper
  • Tube cutter
  • Small screwdriver/excess filament removal instrument


Software

  • Slicing software
  • Freecad (if you wanna edit the designs)

image6.jpg
image14.jpg
image13.jpg
image2.jpg

Assuming you already have G-Code for the printer of your choice generated by some slicing software (ie. prusa slicer) print out the end and remove the bottom chaff that it’s printed with.


I usually use 100% infill with 0 support and it works well

image11.jpg
image27.jpg

You may notice a line that goes from the top of the end to the base (called the seam in 3d printing), to ensure more even fitment file it off

image17.jpg

File around the base of the end a bit  to allow for easier fitment

image23.jpg
image3.jpg
image4.jpg
image18.jpg

Unwrap wire from ends of geiger tube and starting on the negative (glass side) push the end cap loosely  in and fully seat it with pliers. If you feel the end is too tight, shave off a bit more from the base

image9.jpg
image19.jpg

Print another end cap (realistically just print like 16 of these things at a time and prep them ahead, both sides, although different, use the same end cap) and bore out the inside with a small screwdriver removing any excess filament that may have extended in the inside of the end cap.

image5.jpg
image10.jpg

Feed the wire and metal end (+) of the SBM-20-1 through the end cap and seat it with pliers just like the other side.

image1.jpg
image22.jpg
image28.jpg
image7.jpg

Cut off a bit of the brass tube about the same length as the top part of the geiger tube ends. You may notice that this compresses the tube a bit. To combat this (and make the brass fit nicely) open the brass end up with the pliers and cut off another length of tube

image8.jpg
image12.jpg
image16.jpg
image25.jpg

If needed sand down around the top slightly for a better fitment of the brass tube, then on the positive side bend the wire down and fit the brass down with pliers, BE CAREFUL. It’s very easy to bend the tube at this stage. Once the brass tube is down, wrap the excess wire around the base of the small brass part we cut making sure that the wire does not come in contact with the metal body of the tube

image26.jpg
image20.jpg
image24.jpg

Apply the same basic principles from the last step, but on the - side. Bend the wire up, and fit the brass around it

image15.png

Use the tube!